Versions Compared
Version | Old Version 4 | New Version Current |
---|---|---|
Changes made by | ||
Saved on |
Key
- This line was added.
- This line was removed.
- Formatting was changed.
How are Time Error and PDV calculated?
Panel | ||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
The calculations for PDV and Time Error are very similar. Both are based on packet timestamps. The diagram below shows the messages involved and the associated timestamps (using a BC as an example):
PDVPDV is calculated in the forward direction using the timestamps carried in the Sync messages (T1) and in the reverse direction using the timestamps carried in Delay-Response messages (T4). T2 and T3 are the timestamps from the test equipment (Paragon, Sentinel). For each message transaction (i), the calculations are:
The PDV values above are then plotted against time. Since PDV is about delay variation, the PDV result is normalised to the lucky packet (the packet with the shortest delay). Time ErrorTime Error is calculated using the same timestamps as PDV. For each message transaction (i), the calculations are:
The Time Error is then plotted against time.
PDV Compared to Time ErrorFrom the above, it follows that the Sync PDV graph will be inverted compared to the T1TE. In addition, PDV is normalised to the lucky packet and will always be positive. For example: Sync PDV:
T1 Time Error:
The Delay-Req PDV will have the same shape as T4TE but Delay-Req is normalised to the lucky packet and will always be positive. |
Related articles
Filter by label (Content by label) | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
On this page:
Table of Contents |
---|